SR 99
Alaska Way Viaduct Replacement Tunnel
Project Details
ROLE
Drilled-Shaft Subcontractor
CONTRACT AMOUNT
$4.6 Million
OWNER
Washington State Department of Transportation
LOCATION
Seattle, WA
ARCHITECT
HNTB
SIZE
1.8 Miles
COMPLETION
2019
Project Description
The SR 99 Alaskan Way Viaduct was replaced with an approximately two-mile-long double-deck tunnel underneath downtown Seattle. Replacing the viaduct with a tunnel allows the highway to remain open for much of construction, thus minimizing closures and impacts to traffic. Once the tunnel opens, the viaduct will be taken down to clear the way for new public space along Seattle’s downtown waterfront.
Photo Credits: WSDOT