SR 99
Alaska Way Viaduct Replacement Tunnel
Project Details
        
					ROLE
					Drilled-Shaft Subcontractor
				
						CONTRACT AMOUNT
 $4.6 Million				
                    OWNER
                    Washington State Department of Transportation
                
                    LOCATION
                    Seattle, WA
                
                    	ARCHITECT
	                    HNTB
    	            
        	            SIZE
    	                1.8 Miles
	                
COMPLETION
2019
Project Description
			The SR 99 Alaskan Way Viaduct was replaced with an approximately two-mile-long double-deck tunnel underneath downtown Seattle. Replacing the viaduct with a tunnel allows the highway to remain open for much of construction, thus minimizing closures and impacts to traffic. Once the tunnel opens, the viaduct will be taken down to clear the way for new public space along Seattle’s downtown waterfront.
Photo Credits: WSDOT