River Supply Conduit Improvement
Upper Reach – Unit 7
Project Details
        
					ROLE
					Support of Excavation Subcontractor
				
						CONTRACT AMOUNT
 $3.6 Million				
                    OWNER
                    Los Angeles Department of Water and Power
                
                    LOCATION
                    Burbank, CA
                
        	            SIZE
    	                2.5 Miles
	                
COMPLETION
2021
Project Description
			This project involves replacing nearly 2.5 miles of welded steel pipe needed to supply drinking water to LADWP's service areas. The project includes 11,800 linear feet of 13-foot EPB Tunnel Boring; 11,800 linear feet of pre-cast concrete tunnel segment installation; 500 linear feet of 104-inch microtunneling with Permalock casing; 900 linear feet of open cut excavation; and 13,260 linear feet (2.5 miles) of 78-inch welded steel water line installation.